It is widely criticized that recycling facilities do not have adequate procedures and infrastructure to collect and dispose of the hazardous waste recovered from the ships during the recycling process. However, it is critical to know and understand the infrastructure available at Alang. 

Gujarat Maritime Board (GMB) is the regional regulatory body supervising recycling activities in Alang, India. GMB constructed the landfill site and assigned Gujarat Enviro Protection Infrastructure Limited (GEPIL) as an operator for the Treatment, Storage, and Disposal of hazardous waste recovered from the vessels during the recycling process. The first facilities were constructed in 2005-2006. The facilities had the following cells and capacities.

  • Asbestos and glass wool disposal cell: 43,000 M3
  • Industrial hazardous wastes: 10,200 M3  
  • Municipal solid waste: 8,700 M3

When the capacity of the above landfill cells was about to complete, GMB expanded the earlier capacity in 2013 to new landfill cells of a total of 100,000 M3. The facility was further upgraded by installing a separate oily bilge water treatment plant that can treat bilge water recovered from the ships. The separated oil is stored in the designated tanks until enough is accumulated. To burn the oil, an incinerator plant was installed. A key point to note, the separated water is stored in the underground and overground tanks, which can be used as firefighting water for the incinerator. Excess water is used for trees planted on the site. With the addition of an incinerator and bilge water treatment plant, the GEPIL site became a fully integrated waste management facility.

Infrastructure for Treatment, Storage and Disposal of Hazardous Waste

The existing capacity of the GEPIL Treatment Storage Disposal Facility (TSDF) at Alang is as below:

  • Landfill cell for hazardous waste: 70,000 M3
  • Landfill cell for municipal solid waste: 35,000 M3
  • Common hazardous waste incinerator: 5 MT/day
  • Fire Fighting System, Underground reservoir: 200 M3
  • Effluent treatment plant: 30 M3 / day

It is evident that the recycling facilities have sufficient infrastructure to dispose of hazardous wastes. HKC compliant recycling facilities hand over the segregated waste only to GEPIL against the receipts. Waste disposal is appropriately documented. Since its inception, GEPIL has managed 65,000 MT of ship recycling waste.

The commitment shown by the local regulatory bodies and yards for sustainable ship recycling is commendable.  

Contact Us

Ship Recycling Team

About Author

Kiran Thorat is a Trader at GMS, where he looks after sustainable ship recycling projects. Kiran believes that Sustainable Recycling is an integral part of Sustainable Shipping and a notable example of a circular economy. He holds a Bachelor's Degree from the Marine Engineering and Research Institute (DMET), India, and a Master's Degree in Energy, Trade, and Finance from Cass Business School, London.

Dr. Anand M. Hiremath is a Civil Engineer and holds a Master's Degree in Environmental Engineering from the Indian Institute of Technology Guwahati (IIT Guwahati), India. He was awarded Doctorate Degree in the year 2016 for his research work on Ship Recycling by the Indian Institute of Technology Bombay (IIT Bombay), India. In addition, he has a diploma in Industrial safety, is a qualified lead auditor for ISO 9k, 14k and 18k. Dr. Hiremath published the first practical handbook on ship recycling, entitled: "The Green Handbook: A Practical Checklist to Monitor the Safe and Environmentally Sound Recycling of Ships" which highlights the procedures the GMS RSRP follows to help both Ship and Yard Owners recycle a vessel in an environmentally-friendly manner. He is the Chief Sustainability Officer of GMS.